Waterproofing & tiling materials and solutions · Keshun · LeafSeal · Demex Hanoi timeVI
LeafSeal BC025 – One-component, pre-mixed, self-levelling cementitious floor screed

LeafSeal

LeafSeal BC025 One-component, pre-mixed, self-levelling cementitious floor screed

Pre-mixed cementitious floor screed applied by pouring, self-levelling with flow ≥ 250 mm; thickness from 15 mm, 28-day compressive strength ≥ 10 N/mm².

Request a quotation 0903 166 617

  • Genuine LeafSeal products, distributed in Vietnam by VNA
  • TDS and test reports viewable right on this page
  • Goods delivered with CO/CQ per batch
  • Support with material selection, consumption and submittal dossiers

TDS and test reports

LeafSeal BC025 technical dossier

14 pages Download PDF (2.3 MB)

LeafSeal BC025 technical dossier – page 1 LeafSeal BC025 technical dossier – page 2 LeafSeal BC025 technical dossier – page 3

Applications

  • Floor screeding in dry areas of apartments, hotels, offices, hospitals, schools and shopping centres
  • Bonded screeds on suitably prepared concrete or cement mortar substrates
  • Screeds over a separation membrane or waterproofing system, subject to an approved method statement
  • Underlayment for tile, stone and timber floor finishes

Advantages

  • Flow ≥ 250 mm with self-levelling properties
  • 28-day compressive strength ≥ 10 MPa
  • Ready for light foot traffic after 24 hours
  • Factory pre-mixed for controlled mix proportions and consistent quality
  • Applied at a screed thickness starting from 15 mm

Application steps

  1. Check levels and construction joints; concealed MEP services and waterproofing must be accepted first. Substrate sound and clean; scabble or grind overly smooth concrete.
  2. Bonded screeds: pre-wet to saturated surface-dry, apply a bonding slurry containing LeafSeal Latex 655 and place the mortar while the bonding layer is still wet.
  3. Gradually add the powder to 24–28 % clean water while mixing at low speed (< 500 rpm) for 3–5 minutes until flow ≥ 250 mm; check the flow every 30 minutes.
  4. Pour and spread evenly with a screed rake to a minimum thickness of 15 mm; maintain continuous application, preferably wearing spiked shoes.
  5. Protect from sunlight, wind, rain and vibration; once sufficiently hard (typically after 12–24 hours), moist-cure continuously for at least 3 days.
  6. Light foot traffic after about 24 hours; heavy loads or floor finishes at least 3 days after application and once the required strength and moisture content are met.

Notes

  • Control the water quantity with measuring equipment or a metering device; excess water may reduce strength and increase shrinkage and segregation.
  • Do not add water to or remix mortar that has started to set or has a flow < 250 mm.
  • Do not bridge structural or movement joints; provide expansion and construction joints per the drawings.
  • Do not apply to excessively hot substrates, or during rain, intense sunlight or strong winds without suitable protection.
  • Before installing the floor finish, check screed flatness, strength and moisture content against the requirements of the finishing material.

Technical data

PropertyValueStandard
Initial flow≥ 250 mmTCVN 9204
Flow after 30 minutes≥ 250 mmTCVN 9204
Compressive strength (at 28 days)≥ 10.0 N/mm²TCVN 3121-11
Adhesive strength≥ 0.5 N/mm²TCVN 3121-12
Application thicknessMinimum 15 mm
Light foot trafficApproximately 24 hours at 25 ± 2 °C
Application temperature+5 °C to +35 °C

Packaging

  • 40 kg bag
  • Grey powder
  • Shelf life 6 months

Consumption

  • Mixing ratio: 24–28 % clean water by weight of powder
  • Theoretical consumption: approximately 1.40–1.50 kg of powder/m² per mm of thickness

Data per LeafSeal BC025 TDS, version 01 (08/2026). Test values were obtained under laboratory conditions; contact VNA for the latest technical documents.

Need a quotation for LeafSeal BC025?

VNA helps select materials, prepares submittal dossiers and guides application on site.

Contact VNA 0903 166 617

Contact