Waterproofing & tiling materials and solutions · Keshun · LeafSeal · Demex Hanoi timeVI
LeafSeal BC014 – One-component, high-strength polymer-modified cementitious repair mortar

LeafSeal

LeafSeal BC014 One-component, high-strength polymer-modified cementitious repair mortar

One-component, pre-mixed polymer-modified cementitious repair mortar with 28-day compressive strength ≥ 40 N/mm², for patching voids, honeycombs and spalled concrete.

Request a quotation 0903 166 617

  • Genuine LeafSeal products, distributed in Vietnam by VNA
  • TDS and test reports viewable right on this page
  • Goods delivered with CO/CQ per batch
  • Support with material selection, consumption and submittal dossiers

TDS and test reports

LeafSeal BC014 technical dossier

13 pages Download PDF (2.6 MB)

LeafSeal BC014 technical dossier – page 1 LeafSeal BC014 technical dossier – page 2 LeafSeal BC014 technical dossier – page 3

Applications

  • Rapid repairs on vertical, horizontal or overhead concrete surfaces
  • Filling and patching voids and honeycombs
  • Restoration of spalled concrete sections and protection of reinforcement from corrosion

Advantages

  • High compressive strength, low shrinkage after application
  • Thermal expansion similar to that of concrete
  • Chloride-free and non-corrosive to reinforcing steel
  • Pre-mixed for consistent quality
  • Environmentally friendly, free from volatile organic compounds (Low VOC)

Application steps

  1. Surface clean, sound, free of dust, grease and contaminants; pre-wet to a saturated surface dry (SSD) condition without standing water.
  2. Gradually add the powder into a container with 13–14 % clean water (by weight) and mix with a low-speed hand mixer for 3–5 minutes until homogeneous and lump-free.
  3. Apply a bonding slurry coat (using LeafSeal Latex 655) by brush, roller or sprayer; apply BC014 while the bonding layer is still damp.
  4. Firmly compact the mortar at the edges and work inward.
  5. Apply in multiple layers if thickness exceeds 20 mm, allowing at least 12 hours between layers.
  6. Cure with wet burlap, PE film, curing compound or mist spraying for 48 hours.

Notes

  • Store in a dry place, away from direct sunlight, at 5 °C to 35 °C.

Technical data

PropertyValueStandard
Compressive strength, 1 day (at 27 °C)≥ 10 N/mm²TCVN 3121-11
Compressive strength, 28 days (at 27 °C)≥ 40 N/mm²TCVN 3121-11
Adhesive strength≥ 1.0 N/mm²TCVN 3121-12
Application time60 minutes
Application temperature6–40 °C

Packaging

  • 25 kg bag
  • Grey powder
  • Shelf life 6 months

Consumption

  • Mix ratio: water / powder = 13–14 % by weight
  • One 25 kg bag gives about 12.5 litres of mortar
  • About 76 bags for 1 m³ of mortar

Data per LeafSeal BC014 TDS, issue 01 (06/2026). Test values were obtained under laboratory conditions; contact VNA for the latest technical documents.

Need a quotation for LeafSeal BC014?

VNA helps select materials, prepares submittal dossiers and guides application on site.

Contact VNA 0903 166 617

Contact